News Cubic Studio

Truth and Reality

Uttarakhand : 10 rural connectivity roads including Yamunotri Highway closed

Due to rain, the Gangotri and Yamunotri highways have been disrupted due to landslides. Yamunotri Highway has been closed due to debris coming near FEDI. At the same time, 10 rural connectivity roads of the district have also been blocked due to debris. Along with this, the road near Nagun and Dharasu on Gangotri Highway was also able to be smooth after several hours. Due to continuous rains, the local people are facing problems due to closed and open roads. Gangotri Highway near Nagun and Dharasu was cleared for movement after 6 hours in the afternoon. At the same time, near Bhatwadi on Gangotri Highway, the highway remained closed for some time due to a truck getting stuck in the debris. The movement was made smooth by pulling the truck out of the rubble. Along with this, due to the continuous falling of boulders from the hill near Ratudesera, the process of closure and opening of the highway is going on. At the same time, near Bhatwadi on Gangotri Highway, the highway remained closed for some time due to a truck getting stuck in the debris. The movement was made smooth by pulling the truck out of the rubble. Along with this, due to the continuous falling of boulders from the hill near Ratudesera, the process of closure and opening of the highway is going on.